Difference between revisions of "Imeji Release versioning"
Jump to navigation
Jump to search
Kleinfercher (talk | contribs) m |
Kleinfercher (talk | contribs) m (moved Imeji Versioning to Imeji Release versioning) |
(No difference)
|
Revision as of 08:54, 4 March 2013
Concept
imeji can use a sequence-based change specific four letter versioning:
1.2.3.4
- Where the change of the first position means that the software update is not downwards compatible (Migration is necessary)
- The change of the second position means a stable functional release
- The change of the third position means a stable bugfix release
- A release candidate expresses itself with a change in the last (fourth) position