Difference between revisions of "MPDL SvM Meeting 2009-11-04"

From MPDLMediaWiki
Jump to navigation Jump to search
Line 17: Line 17:
* Backlog
* Backlog
:* Integrate functionalities from R3.5 or start afterwards?
:* Integrate functionalities from R3.5 or start afterwards?
* Generalization Release (3.2)
:* Was released on qa yesterday
* R3.5
:* We had a prototype meeting on Monday
:* Minor changes still have to be done, e.g. search in released album list (Denise)
:* Specification has to be adapted (Kristina)
:* GUI V2 can start next week (Markus M.), as soon as R3.2 is released on live
:* Scope is really heavy (see [[Faces_Scope#R3.5]]), perhaps we can split it in two releases


==VIRR==
==VIRR==

Revision as of 07:35, 4 November 2009

PubMan[edit]

edoc2PubMan Migration[edit]

PubMan extensions[edit]

JusCMS[edit]

LingLit[edit]

ZfN[edit]

FACES[edit]

  • First time estimations have been done
  • For some points, further specification is needed
  • Backlog
  • Integrate functionalities from R3.5 or start afterwards?
  • Generalization Release (3.2)
  • Was released on qa yesterday
  • R3.5
  • We had a prototype meeting on Monday
  • Minor changes still have to be done, e.g. search in released album list (Denise)
  • Specification has to be adapted (Kristina)
  • GUI V2 can start next week (Markus M.), as soon as R3.2 is released on live
  • Scope is really heavy (see Faces_Scope#R3.5), perhaps we can split it in two releases

VIRR[edit]

  • R2.6.1 was released on Friday. Heavy bugs were detected, therefore we will need a bugfix release (hopefully end of this week by Markus H.)
  • Performance tests started, no problems expected.
  • The institute needs R2.6 with all books on live server before beginning of dec. (for presentation)

CoLab/TWR[edit]

Dariah[edit]

Other[edit]